OUR WORK
Some of ESB's achievements!
1,500 km MV network, 2,000 km LV network, 200 localities electrified
Customer:
OMVS-SOGEM
Physical size:
- 31 KM of MV line
- 07 KM of LV: E.P
Amount:
430,038,698 F.CFA
Start date:
04/12/2015
End date
17/03/2017
Customer:
OMVS-SOGEM
Physical size:
- 12.5KM MV overhead line 33 kV and installation of
associated H61 transformer - 12KM Low Voltage Line and Lighting
public
Amount:
299.892.255 F.CFA
Start date:
20/07/2014
End date
25/05/2016
Customer:
SOMELEC
Physical size:
- 400 KM of low-voltage network
- Public lighting
Amount:
798 379 $US
Start date:
: 02/02/2015
End date
23/08/2017
Customer:
AMEXTIPE
Physical size:
- M&P of a 0.4/15 kV transformer substation of
power 1000 kVa - F &P of 4 15/0.4 kV transformer substations of
power 63 kVa - 160 kVa H61 power transformer F&P
- 12 km of LV underground network
- 11.8 km of LV overhead network + street lighting
- Rehabilitation of the existing 5kV MV network in 15
kV)
Amount:
1,168,826 $US
Start date:
12/07/2011
End date
23/08/2017
Customer:
TASIAST-KINROSS
Physical size:
- 21 KM 33 kV MV double-circuit line with
associated transformer stations and fiber optics
(OPGW)
Amount:
5 399 571, 32 $ US
Start date:
18/05/2012
End date
29/12/2013
Customer:
TASIAST-KINROSS
Physical size:
- 15 kV MV double-circuit line with pos
Amount:
2,398,171.94 $US
Financial backer:
KINROSS
Start date:
29/02/2012
End date
20/12/2012
Customer:
SOMELEC
Physical size:
1. Design, supply, installation and commissioning of 2 MV lines + associated substations (Aioun & Timbedra)
Initial contract:
- 33 kV overhead lines: 180 km
- MV/LV overhead substation type H61 (kVA + 2 x160 kVA): 11
- 33/1 5 kV substation: 02 (Aioun: 2 v. 2500 kVA and Tirnbédra: 2 1600 kVA)
- MT posts: 1093
- LV twisted network: 8l km
- Number of connections: 1458
Contract Amendment:
- 1 prefabricated substation 33/0.4 kV 400 KV
- 2 x prefabricated cabin substation 15/0.4 kv 250 kvA + 2XH6l
l5/0.4 kvA 160 kvA. - LV network: 7.6 km
- MV network: 5.4 km
- Number of connections: 1280
Amount:
251 120 070 MRU
Financial backer:
Fund Arabic for the Dévelopment Économics and Social - FADES
Start date:
25/10/2016
End date
04/03/2019
Customer:
SOMELEC
Physical size:
1.design, supply, installation and commissioning
work:
Initial contract:
- 33 kV medium-voltage overhead lines: 150 km
- MV/LV overhead substation type H61 100kVA : 06
- MT posts: 1089
- LV twisted network: 60 km
- Number of connections: 2626
Contract Amendment:
- 1 cabin substation 33/0.4 kV 250 kV
- 1 x substation 15/0.4 kv 250 kvA + 1XH6l l5/0.4 kvA
160 kvA. - 1 x substation 15/0.4 kv 250 kvA + 3XH6l l5/0.4 kvA
160 kvA - LV network: 7.8 km
- MV network: 5.1 km
- Number of connections: 604
Amount:
242,770,500 MRU
Financial backer:
Fund Arabic for the Dévelopment Économics and Social - FADES
start date:
25/10/2016
End date
04/03/2019
Customer:
SOMELEC
Physical size:
- A 15/33 kV transformer substation
- Construction and commissioning of a 15KV MV line from
length 4000 ml - Connection to the busbar of the Koubenni power plant
(630A circuit-breaker cubicle) - Construction and commissioning of a 33 kV MV line from
length of 19,000 ml - Construction and commissioning of a long LV line
8900ml - Installation and commissioning of 2 (two) H61 substations,
33kV/400 V - 160 kVA with pole-mounted circuit breaker - Installation and commissioning of a public lighting package comprising
2 cabinets and 100 fireplaces.
Amount:
26,139,663 MRU
Start date:
18/06/2022
End date
02/09/2023
Customer:
SONABEL (BUKINA FOSA)
Physical size:
- 360 M HV underground line 150 mm2 33 kV
- 576 M M HV underground line 150 mm2 15 kV
- 10845 M overhead HV mixed line75.5 mm2 15 kV
- 15800 M 75.5 mm2 33 kV overhead HV mixed line
- 186810 M BTA underground line 70 mm2 Alu
- 6762 M BTA underground line 70 mm2 Cu
- 3 MV/LV substation 250 KVA-15 kV cab
- 13 MV/LV substation 400 KVA-33 kV cabin
- 3 MV/LV substation 400 KVA-15/0.4 kV on gantry crane
Amount:
3,817,615,704 FCFA
Start date:
15/01/2019
End date
20/05/2022
Customer:
SENELEC (SENEGAL)
Physical size:
- Electrical equipment for 4 MV/LV substations
- Electrical retrofitting of a delivery substation
(Kédougou power plant) - Electrical re-equipment of SODEFITEX substation
- Supply and installation of 20 prefabricated
outage - Supply and installation of 6 prefabricated TE substations;
- Supply and installation of 5 New H61
- Construction and electrical equipment of two (02)
High posts in Mbembou and Banda Fassi - Construction of two delivery substations
- H61 replacement
- 125 km low-voltage network extension
- Construction of 80 km of MV overhead network
Amount:
3,817,615,704 FCFA
Financial backer:
World Bank
Start date:
15/01/2019
End date
A Revoir
ESB is a Mauritanian company specializing in the fields of electricity, hydraulics and power generation.
civil engineering. With 25 years' experience in infrastructure, ESB has an experienced technical staff offering efficient technical solutions. Through its procedures ...